Sakura PAI Industrial Park
Sakura City, Chiba
A full-lifecycle PAI landing vehicle, pre-wired for compute and power.
Location Advantages
Near compute
Adjacent to the Inzai data-center cluster — 2,500 MW awaiting grid connection. Training compute is next door.
International gateway
Minutes from Narita Airport — a hub for international talent, logistics and cross-border teams.
Testing grounds
Extensive physical test space supporting end-to-end PAI validation from pilot to scale-out.
Power Strategy
TEPCO Welcome Zone
Prior agreement locks in residual power quota — interconnection risk is de-risked up front.
Off-grid hybrid backup
A gas + storage hybrid means IRR is not held hostage by a single point of grid-interconnection delay.
Power as an operator magnet
Secured, always-on power is a structural incentive that pulls quadruped operators into the park.
Three-Computer Architecture
Train — Simulate — Deploy: one continuous PAI loop, all on park premises.
Training Computer
Heterogeneous factory-floor data is distilled into the robot's high-level brain policy.
Simulation Computer
A WFM 3DGS digital twin removes the cost and risk of training on physical hardware.
Deployment Computer
Edge real-time inference — Flow Matching within 32 ms, supporting 100 Hz+ high-frequency control.
Anchored Ecosystem & Customer Funnel
Mitsubishi Electric
Anchor tenant — the first industrial customer slot in the park.
Noetra national team
SoftBank / Sony / Honda, served by a dedicated JPY 387.3B METI budget.
Talent spine
Chiba Tech fuRo at the core, linked to NYCU / NTU; KOSEN handles on-site data and maintenance.