Investment Engines

PAI Fund

A Physical AI investment engine — the landing vehicle, the technical execution layer, and the compliance moat behind FVIG's expansion across Taiwan and Japan.

Not a robot — a compliant, end-to-end Physical AI deployment chain.

Physical AI's value is in atoms, not bits. PAI Fund enters the market as a stack: a park vehicle, a technical execution layer, and a Taiwan compliance buffer belt — one deployment chain, not a standalone product.

Park vehicle · Fortune Capital

Sakura PAI Industrial Park in Chiba — the train / simulate / deploy landing vehicle and exit path.

Technical execution · AICONN

Layer A skill & safety manager on the deployment computer, plus Layer C in-Taiwan Sim-to-Real.

Taiwan compliance buffer belt

Origin-based rebuild that turns geopolitical risk into a Taiwan supply-chain dividend — a moat, not a detour.

The capital gap and the policy tailwind arrive at the same time.

~18×

Catch-up capital

Robotics is a 30× software-sized prize with 18× fewer funded companies — the start of bits-to-atoms catch-up.

JPY 55T

Japan's 2040 market

Cabinet Office estimate of the Physical AI market by 2040; factory-floor (Genba) data is the scarcest asset.

+14~30%

ZEB gap = PMF entry

The zero-energy-building performance gap makes automated inspection and energy diagnostics the first paid scenario.

JPY 387.3B

Concrete funnel

Mitsubishi anchor plus the Noetra national-team budget — demand is no longer an assumption.

PAI's value is in atoms, not bits. Whoever holds factory-floor deployment plus a compliance path holds the next moat.

Flagship Projects

Physical AI landing vehicles, pre-wired for compute, power, and compliance.

Sakura PAI Industrial Park

Sakura City, Chiba

A full-lifecycle PAI landing vehicle, pre-wired for compute and power.

Location Advantages

  • Near compute

    Adjacent to the Inzai data-center cluster — 2,500 MW awaiting grid connection. Training compute is next door.

  • International gateway

    Minutes from Narita Airport — a hub for international talent, logistics and cross-border teams.

  • Testing grounds

    Extensive physical test space supporting end-to-end PAI validation from pilot to scale-out.

Power Strategy

  • TEPCO Welcome Zone

    Prior agreement locks in residual power quota — interconnection risk is de-risked up front.

  • Off-grid hybrid backup

    A gas + storage hybrid means IRR is not held hostage by a single point of grid-interconnection delay.

  • Power as an operator magnet

    Secured, always-on power is a structural incentive that pulls quadruped operators into the park.

Three-Computer Architecture

Train — Simulate — Deploy: one continuous PAI loop, all on park premises.

Training Computer

Heterogeneous factory-floor data is distilled into the robot's high-level brain policy.

Simulation Computer

A WFM 3DGS digital twin removes the cost and risk of training on physical hardware.

Deployment Computer

Edge real-time inference — Flow Matching within 32 ms, supporting 100 Hz+ high-frequency control.

Anchored Ecosystem & Customer Funnel

Mitsubishi Electric

Anchor tenant — the first industrial customer slot in the park.

Noetra national team

SoftBank / Sony / Honda, served by a dedicated JPY 387.3B METI budget.

Talent spine

Chiba Tech fuRo at the core, linked to NYCU / NTU; KOSEN handles on-site data and maintenance.

Ichinoseki Station East Exit Former Factory Site

Ichinoseki, Iwate

A city-led redevelopment of the former NEC Platforms Ichinoseki site — directly adjacent to JR Ichinoseki Station's east exit, about 83,611 m².

Project Snapshot

~83,611 m²
Site scale

A former industrial site directly adjacent to the JR Ichinoseki Station east exit.

City-led vehicle

The city acquires the land and leads stable, long-term utilization through a dedicated management company.

Three zones

Vibrancy (commerce, tourism, local products), Exchange (public facilities and a green plaza), and Innovation (R&D and offices).

~JPY 9.0B / ~JPY 7.8B
Economic effect

About JPY 9.0B in construction investment before opening; about JPY 7.8B in annual consumption after opening.

Development Schedule

  1. FY2026 (R8)
    NEC → city land handover completes at the end of October.
  2. FY2027 (R9)
    Basic infrastructure design begins; development consultation starts.
  3. FY2028 (R10)
    Basic infrastructure construction.
  4. FY2029+ (R11)
    Building and facility development begins.

Taiwan × Japan Presence

A structural answer to the FCC Covered List — a moat, not a detour.

The Buffer Structure

Taiwan SPV — the white-label vehicle

FEFTA-compliant entry into Japan's sensitive infrastructure; core data and instruction sets stay out of external reach.

65% local value content

Control of the core ASIC and BOM; the product is marked 'Produced in Taiwan' — geopolitical risk becomes a supply-chain dividend.

The FCC Reality · Effective 2026-07-28

Origin decides — brand nationality does not

Mobile-robot imports are restricted by place of origin after 28 July 2026.

Conditional approval is unacceptable

It would force handing over firmware architecture and supply-chain lists. Our intent: zero IP handover.

The Window

  1. License the US brain model

    Model IP stays licensed, not surrendered.

  2. Sim-to-Real locally in Taiwan

    Data sovereignty; 65% local value content.

  3. Deploy to Japan as Made in Taiwan

    A FEFTA-compliant SPV enters sensitive infrastructure.

Technical Execution · AICONN

The park's capabilities map one-to-one onto AICONN's Layer A and Layer C.

Layer A · Deployment computer

Skill manager + hardware watchdog. 50 Hz switching, 200 ms recovery. ISO 13849 functional safety is the industrial procurement barrier — isomorphic to the park’s 100 Hz+ control.

Layer C · In-Taiwan Sim-to-Real

The paid commercial loop and sole executor of the 'train locally in Taiwan' blueprint. ZEB energy diagnostics + plant inspection = the first paid scenario, on the +14~30% performance gap.

Four-Layer System Architecture

Heterogeneous and decoupled — tiered by frequency. The lower the layer, the higher the frequency.

Mission layer · Cognitive brain
Mission planning LLM / Agent · 3D scene graph · target object recognition
0.5–2 Hz · non-real-time · onboard / cloud
Scheduling intermediary · Cerebellar bridge
Skill scheduler · trajectory interpolation · Safety Governor
10–20 Hz · soft real-time · onboard CPU
Locomotion layer · Locomotion cerebellum
RL policy inference ONNX / TensorRT · proprioceptive IMU + joint history
50–200 Hz · hard real-time · GPU / NPU
Drive layer · Spinal / actuator
FOC motor drive CAN-FD / EtherCAT · encoder feedback · E-Stop
500–1000 Hz · hard real-time MCU

Positioning & Sequencing

The three positionings are not parallel — they are stacked.

Wedge · 0–6 mo

A · Skill library + safety arbitration

A technical wedge, not a product. Moat = ISO 13849 safety + real-machine anomaly data.

Internal · not sold

B · Edge heterogeneous inference runtime

NVIDIA Holoscan already covers ~80%; customers won't pay separately. Internal only.

Backbone · 6–18 mo

C · Sim-to-Real scenario fine-tuning loop

The only layer without complete product coverage — paid adaptation fees on vertical scenarios.

Sequencing — A wedge → C backbone → B internal. One closed loop, not three products.